HOME
ABOUT US
C.E.R.M. NEWS
SERVICES
PROJECTS
OBJECTIVES
CAREERS
CONTACT US



 

Headline for 11/06/2009

C.E.R.M. Helps to Keep ASPA Connected

The Alabama State Port Authority is embarking on an important project to construct a roadway connecting the Mobile Container Terminal and Garrow’s Bend Intermodal Container Transfer Facility at ASPA. In partnership with Volkert & Associates, Geotechnical Engineering-Testing, Inc. and Synergy Earth Systems, Corporate Environmental Risk Management (CERM) will:
• Provide surveying services
• Perform geotechnical and material investigations
• Design and develop final construction documents for bridges and roadways
• Design and analyze roadway runoff
• Coordinate utility relocation
• Design roadway lighting
• Assist with the contractor bidding process
• Perform construction engineering inspections
• Provide environmental permitting and compliance support throughout each phase of the project

Surveying and data collection will began in Mid-September, and construction is expected to begin in 2010.

Other News




© 2005 C.E.R.M., Inc. All Rights Reserved.